Solar : Quebec’s most forward-thinking development

Designed to be people-friendly, an immense 12,000 m2 park will be located in the heart of the district.

Designed to encourage pedestrian and cyclist traffic.

Solar Uniquartier
Solar Uniquartier

Strategically located at the crossroads of Highways 10 and 30 in Brossard.

Solar will provide direct access to the future REM station.

Design of 4 HydroStor retention systems installed under the central park and parking lots.

Allow storage of 13,827 m3 (488,296 ft3).

Solar Uniquartier

Quotes

The selection of retention solutions in HydroStor chambers is based on the quality of the product, Soleno’s expertise and compliance with plans and specifications.
- Marie Bernier-Roy, ing., Engineer at Soleno

There was excellent technical assistance from your team during the design phase. You offered a complete service that facilitates the implementation of solutions for us. Thank you!
- Valérie Aubé, P.Eng., Engineer at GBi

At the early stages of the project, Soleno was able to develop a configuration that met our needs. In addition to providing exemplary support, budgets have been respected.
- Eric Boucher, Chief Estimator at Devimco

Images and Quotes

Complexe au Centre-ville_bassin_solflomax
Complexe au Centre-ville_bassin_solflomax

HDPE pipes have the advantage that they can be welded together to obtain watertight lengths and thus reduce the number of joints to a minimum when project constraints require it. This same project built out of concrete would have required about 2.3 times more joints, increasing the risk of possible leaks.
- hilippe Losier, engineer at Soleno

Complexe au Centre-ville_bassin_solflomax

The engineer Philippe Losier, along with Robert Burtt, engineer and plant manager at the McAdam plant, provided a constant presence and remarkable support during the design phase and throughout the installation.
- Darryl Bonhower, Engineer at City of Moncton

Complexe au Centre-ville_bassin_solflomax
Complexe au Centre-ville_bassin_solflomax
Complexe au Centre-ville_bassin_solflomax
Complexe au Centre-ville_bassin_solflomax

Images and Quotes

One of the obstacles encountered was convincing the governmental authorities that provided funding to admit the use of large-diameter HDPE products.
- Technical service

The use of HDPE pipes allowed us to achieve the project in less time, while allowing us to adapt to problematic site conditions.