The Context
Construction of two underground storm water chamber systems
As part of the expansion of Bishop P. F. Reding Catholic Secondary School in the Town of Milton, Ontario, the contractor Drain Land Inc.was to build two underground storm water retention systems under the school’s new parking lots. The benefits of this economical, simpleand quick installation system convinced the Flora Designs Inc. design team and the contractor Drain Land Inc. to build the underground retention systems using HydroStor chambers.
Discover our Storage Solutions Complete Case Study
The Solution
In June 2019, the contractor Drain Land Inc. under the supervision of Mr. Alex Verkhovsky, Project Manager, built two retention systems using HydroStor underground storm water chambers. Installed on a stabilization geogrid, the two basins will store 112.9 m³ (3987 ft³) and 32.1 m³ (1133 ft³) of water respectively during heavy rainfall events. Occupying an area of 175.7 m2 (1891 ft2), the first four-row basin has 48 HS75 chambers, all surrounded by clean stone. The second basin, with a surface area of 52.2 m² (562 ft2), has 12 HS75 chambers arranged over 3 rows, also surrounded by clean stone. A TX-90 non-woven separation geotextile has been installed on all excavated areas and also covers the clean stone.